Skip to main contentSkip to footer
Powered by Transport for Greater Manchester

Traffic signal switch off request

TfGM (UTC) is responsible for the maintenance and operation of traffic signals within Greater Manchester on behalf of the Greater Manchester Combined Authority.

The maintenance duties are undertaken for TfGM by Yunex Traffic who shall be responsible for providing the accredited and trained personnel for the safe switch off, bagging over and return to correct operation of the installation for the benefit of all highway users.

All requests for Bag Over & Switch Off (BASO) shall be made through TfGM as follows:

Anything out of the hours (Monday – Friday: 8am – 4.30pm), please call 0845 600 1220 or 0161 244 1511 (any other time).

This is not a 24 hour service, so if a message is left on the voicemail, please don't assume that the work is arranged. It is the responsibility of the requester to get any confirmation by email or phone.

Booking request form

Download a booking request form.

Please ensure that all the information on the form has been filled in before sending the request.

All works require a granted permit or in case of emergency works an email confirmation from the local authority confirming details.

Cost of works

Standalone pedestrian crossing (with short notice surcharge). Excludes VAT.Junction (with short notice surcharge). Excludes VAT.
Normal site hours for first attendance (Monday - Friday: 7am - 7pm)£330 + £190 = £520£435 + £190 = £625
Outside above hours£475 + £190 = £665£535 + £190 = £725